What Are the Stages of the Die Casting Injection Process?

Термопластика ЧПУ обрабатывает

The die casting injection process is a precisely orchestrated sequence of speed and pressure adjustments that transforms molten metal into high-quality parts. While it may seem like a single “injection” step, it actually unfolds in distinct stages—each designed to solve a specific challenge, from expelling air to preventing defects like shrinkage or flash. These stages vary slightly by equipment type (НАПРИМЕР., hot vs. Холодные камерные машины) and alloy (алюминий против. цинк), but three mainstream classification systems dominate industry use: the 5-stage (theoretical), 3-stage (simplified), and 4-stage (modern machine) модели. But what happens in each stage? How do they differ? And how to choose the right classification for your production? This article answers these questions with technical details, parameter benchmarks, и реальные приложения.

1. Основные принципы: Why Staged Injection Matters

Before diving into specific stages, it’s critical to understand the “why” behind staged injection. Molten metal behaves differently under varying speed and pressure—rushing it too fast causes turbulence (trapping air and oxide films), while moving it too slow leads to premature solidification (causing undercasting). Staged injection solves this by:

  • Expelling air: Low-speed stages push air out of the pressure chamber and runners, avoiding bubbles in the final part.
  • Preventing splashing: Gentle initial movement stops molten metal from splashing against mold walls (which creates cold shuts).
  • Ensuring full filling: High-speed stages quickly fill complex cavities before the metal cools.
  • Compacting metal: Final pressure stages eliminate shrinkage and boost part density.

Every stage works together to balance flow efficiency (filling the mold quickly) и defect prevention (avoiding air, холодно закрывается, or flash)—the key to consistent die casting quality.

2. Three Mainstream Stage Classifications: Подробное сравнение

The industry uses three primary ways to divide the injection process, each tailored to different equipment and production goals. The table below breaks down each classification, its stages, ключевые параметры, и идеальные варианты использования:

ClassificationStagesKey Objectives & Технические деталиTypical Parameters (Алюминиевые сплавы, Холодная камера)Ideal Application
1. 5-Stage Division (Basic Theory)1. Preparation StageAdjust initial machine state: Reset punch to starting position; preheat pressure chamber to 150–200°C.- Load molten metal into the pressure chamber (volume = part weight + 5–10% отходы).Punch position: 0мм (starting point)- Pressure chamber temp: ±10°C toleranceAll die casting machines; used for training and process validation.
2. Slow Sealing StagePunch moves at low speed (0.1–0.3m/s) to seal the feeding port.- Push molten metal to the front of the pressure chamber—expels 80–90% of air.– Скорость: 0.1–0.3m/s- Travel distance: 50–100 мм (covers feeding port)Prevents air from being drawn back into the pressure chamber; critical for large parts.
3. Accumulation StageMetal accumulates at the inner gate front, building “momentum” for high-speed filling.- Ensures a steady metal supply to avoid gaps during the next stage.– Скорость: 0.3–0.5m/s- Давление: 5–10MPa (maintains flow without splashing)Ideal for parts with thin walls (≤3 мм); ensures uniform metal distribution.
4. Filling StagePunch accelerates to high speed (2–5м/с) to fill the mold cavity quickly.- Ключ: Fill before the metal solidifies (typical filling time: 0.05–0.2s for small parts).– Скорость: 2–5м/с (varies by part thickness; faster for thinner walls)- Ускорение: ≤5m/s² (avoids turbulence)All high-volume production; critical for complex parts with deep cavities.
5. Boosting & Holding StageApply high pressure (50–100MPa) via the booster mechanism to compact molten metal.- Поддерживать давление во время затвердевания (время выдержки: 10-20 с) для устранения усадки.– Давление наддува: 50–100MPa- Время выдержки: 1.2× время затвердеванияДетали, несущие давление (НАПРИМЕР., Гидравлические клапаны); предотвращает дефекты мойки.
2. 3-Stage Division (Классический упрощенный)1. Этап медленного впрыска– Сочетает стадии «медленного запечатывания» и «накопления».: Низкая скорость (0.1–0.5m/s) толкает металл через ворота, вытесняет воздух, и набирает обороты.- Упрощено для удобства эксплуатации — сокращает время настройки параметров..– Скорость: 0.1–0.5m/s- Давление: 5–15МПаДетали малого и среднего размера (НАПРИМЕР., 3Электронные компоненты C); используется на старых машинах с ограниченным контролем параметров.
2. Стадия быстрого впрыскаSame as 5-stage “filling stage”: Высокоскоростной (2–5м/с) fills the cavity quickly.- Focus on cycle efficiency—common in high-volume production (НАПРИМЕР., оборудование из цинкового сплава).– Скорость: 2–5м/с- Filling time: <0.2с (для частей <500глин)Zinc alloy parts (hot chamber machines); fast-cycle products (НАПРИМЕР., bathroom faucet handles).
3. Boosting StageMerges “boosting” and “holding” stages: Apply high pressure (50–80MPa) and hold until solidification.- Simplified for operators to monitor—reduces human error.– Давление: 50–80MPa- Время выдержки: 8–15sНекритические части (НАПРИМЕР., toy casings); low-skill production lines.
3. 4-Stage Division (Modern Machines)1. Slow Pressure Injection StageIdentical to 5-stage “slow sealing stage”: Низкая скорость (0.1–0.3m/s) seals the port and expels air.- Adds real-time pressure monitoring to avoid metal leakage.– Скорость: 0.1–0.3m/s- Давление: 5–10MPa (monitored via sensors)Modern cold chamber machines; parts requiring strict air control (НАПРИМЕР., ЭВ -аккумуляторные корпусы).
2. Стадия быстрого впрыскаSame as 5-stage “filling stage”: Высокоскоростной (2–6m/s) fills complex cavities.- Uses variable speed curves (НАПРИМЕР., J-shaped acceleration) to reduce turbulence.– Скорость: 2–6m/s- Ускорение: 3–5m/s² (smooth ramp-up)Complex aluminum parts (НАПРИМЕР., automotive engine brackets); machines with AI parameter control.
3. Deceleration StageUnique to modern machines: Slow the punch (from 2–6m/s to 0.5–1m/s) as filling nears completion.- Reduces impact on the mold (Продолжая жизнь плесени) and minimizes flash (excess metal at parting lines).Deceleration rate: 2–4m/s²- End speed: 0.5–1m/sВысокие детали (НАПРИМЕР., Компоненты медицинского устройства); molds with tight tolerances (± 0,05 мм).
4. Pressure Holding StageFocus on uniform pressure application: Maintain 50–100MPa until the part’s surface solidifies.- Adds cooling channel synchronization (adjusts water flow to match solidification).– Давление: 50–100MPa- Время выдержки: 10–25s (varies by wall thickness)Safety-critical parts (НАПРИМЕР., automotive steering knuckles); parts requiring high density (≥99,5%).

3. Key Parameter Tuning: Optimize Each Stage for Defect Prevention

Even with the right stage division, poor parameter settings lead to defects. Below is a guide to tuning critical parameters for common alloys and defect risks:

А. Parameter Benchmarks by Alloy

Alloy TypeSlow Stage SpeedFast Stage SpeedBoost PressureВремя выдержки (10mm Thick Part)
Алюминий (Холодная камера)0.1–0.3m/s2–5м/с50–100MPa12–18s
Цинк (Горячая камера)0.2–0.4m/s1–3m/s30–50MPa8–12s
Магний (Холодная камера)0.1–0.2m/s3–6m/s60–90MPa10–15s

Беременный. Defect-Specific Parameter Adjustments

If you’re facing common issues (НАПРИМЕР., пузырьки, холодно закрывается), tweak stages as follows:

ДефектПервопричина (Stage Issue)Parameter Fix
Bubbles/ PorosityFast stage too fast (турбулентность); slow stage didn’t expel air.Reduce fast stage speed by 0.5–1m/s.- Extend slow stage travel by 20–30mm (expels more air).
Cold ShutsFast stage too slow (metal solidifies mid-fill); slow stage too long.Increase fast stage speed by 0.3–0.8m/s.- Shorten slow stage time by 0.5–1s.
Shrinkage SinksBoost pressure too low; holding time too short.Increase boost pressure by 10–20MPa.- Extend holding time by 2–5s (1.2× время затвердевания).
ВспышкаDeceleration stage missing; fast stage too fast (excess metal squeezed into gaps).Add a deceleration stage (0.5–1m/s end speed).- Reduce fast stage speed by 0.5–1m/s.

4. How to Choose the Right Stage Classification

Selecting the best stage division depends on three factors: equipment capability, часть сложности, и объем производства. Follow this decision tree:

  1. Equipment Age/Type:
  • Older machines (pre-2010) with limited parameter controls: Use 3-stage division (simplified, легко эксплуатировать).
  • Modern machines (post-2010) with AI and sensor integration: Use 4-stage division (leverages deceleration and real-time monitoring).
  • Training or lab environments: Use 5-stage division (teaches core principles).
  1. Часть сложности:
  • Простые части (НАПРИМЕР., Плоские скобки): 3-stage division (no need for deceleration).
  • Сложные части (НАПРИМЕР., EV battery housings with thin walls): 4-stage division (deceleration prevents flash).
  • Критические части (НАПРИМЕР., аэрокосмические компоненты): 5-stage division (granular control reduces defects).
  1. Объем производства:
  • Высокий объем (>100k parts/year): 3 or 4-stage (Быстрая настройка, low operator input).
  • Low volume (<10k parts/year): 5-stage (flexible tuning for small batches).

5. Yigu Technology’s Perspective on Staged Injection

В Yigu Technology, we see staged injection as the “brain” of die casting—poorly tuned stages undo even the best mold designs. For automotive clients using cold chamber machines, our 4-stage AI-driven system (with real-time speed/pressure adjustment) reduced defect rates from 7% к <1.8%, cutting scrap costs by $40,000/year for a 100k-part batch. For zinc alloy hardware clients, our simplified 3-stage setup (pre-set parameters for common parts) reduced operator training time by 50%.

We’re advancing two key innovations: 1) Self-learning stage tuning (AI analyzes defect data to optimize speeds/pressures automatically); 2) Cross-alloy parameter libraries (pre-loaded settings for aluminum, цинк, and magnesium, сокращение времени настройки 70%). Our goal is to make staged injection accessible—turning complex parameters into intuitive, reliable controls that boost quality and efficiency for every client.

Часто задаваемые вопросы

  1. Can I skip stages (НАПРИМЕР., deceleration) to speed up cycle time?

Skipping stages risks costly defects. Например, skipping deceleration increases flash by 30–50% (requiring extra trimming time) and shortens mold life by 20% (due to excess impact). Вместо, optimize existing stages: НАПРИМЕР., reduce slow stage speed by 0.1m/s (cuts 0.3s/cycle) without sacrificing air expulsion.

  1. Do hot chamber machines use the same stage classifications as cold chamber?

Hot chamber machines (for zinc/magnesium) often use simplified 3-stage division—they have shorter pressure chambers (less air to expel), so the 5-stage “accumulation” stage is unnecessary. Однако, modern hot chamber machines (post-2015) can use 4-stage division for high-precision parts (НАПРИМЕР., Компоненты медицинского устройства).

  1. How do I know if my stage parameters are optimized?

Use three tests: 1) Air detection: Check for bubbles via X-ray (porosity grade ≤2 per ASTM E446). 2) Fill test: Use a high-speed camera (1000fps) to confirm no splashing or turbulence. 3) Density test: Measure part density (≥99.2% for aluminum alloys). If all pass, your parameters are optimized.