Die casting is a cornerstone of high-volume metal manufacturing, especially for aluminum alloys, enabling the production of precise, complex parts used in automotive, eletrônica, and hardware industries. Yet many engineers and manufacturers still have questions: What’s the core mechanism behind die casting? How do key processes affect part quality? And what parameters need strict control? This article breaks down the fundamental principle, processo passo a passo, otimização de parâmetros, and quality control strategies of die casting—helping you master this efficient manufacturing technology.
1. Core Principle of Die Casting: How Does It Work?
No seu coração, die casting relies on high pressure and high speed to shape molten metal into precise parts. Abaixo está um Estrutura de pontuação total explaining its key mechanisms, power sources, and critical conditions:
1.1 Fundamental Mechanism
Die casting’s core logic is “force-driven filling + pressure-assisted solidification”:
- High-Speed Injection: Metal fundido (Por exemplo, aluminum alloy heated to 660~720°C) is injected into a precision metal mold cavity at speeds of 5~50 m/s. This ensures the metal flows quickly to fill even tiny mold details (Por exemplo, 0.5mm-thin walls or embossed patterns) before solidifying.
- High-Pressure Holding: After the cavity is filled, the die-casting machine maintains a pressure of 20~150 MPa for 1~10 seconds. This compresses the molten metal, eliminates internal pores, and improves part density—critical for parts needing high strength (Por exemplo, automotive engine brackets).
1.2 Power Source: The “Driving Force” of Die Casting
O hydraulic system of the die-casting machine is the key power provider:
- It drives the injection punch to push molten metal into the mold cavity (generating injection force).
- It controls mold clamping force (to keep the mold closed during high-pressure injection, preventing metal leakage).
- Para produção em larga escala, modern machines use servo-hydraulic systems—reducing energy consumption by 30% compared to traditional hydraulic systems while ensuring stable pressure output.
1.3 Critical Conditions: Parameters That Determine Quality
Four core parameters must be strictly controlled to avoid defects like cold shuts (unfused metal seams) or shrinkage holes:
Critical Parameter | Definição | Faixa típica (Liga de alumínio) | Impacto na qualidade |
Temperatura do Metal Fundido | Temperature of the metal liquid before injection. | 660~720°C | Muito baixo: Poor fluidity → incomplete cavity filling. Muito alto: Grain coarsening → reduced part strength. |
Temperatura do molde | Temperature of the metal mold before injection. | 180~ 250 ° C. | Muito baixo: Metal solidifies too fast → cold shuts. Muito alto: Extended cooling time → low production efficiency. |
Pressão de injeção | Pressure applied to push molten metal into the mold. | 20~ 150 MPa | Muito baixo: Internal pores → low part density. Muito alto: Mold damage or metal overflow → scrap parts. |
Filling Time | Time for molten metal to fill the entire mold cavity. | 0.01~0.1 seconds (partes finas); 0.1~0.5 seconds (partes grossas) | Too long: Metal solidifies mid-flow → incomplete filling. Too short: Turbulence → air entrapment (porosidade). |
2. Step-by-Step Process of Die Casting: From Raw Material to Finished Part
The die casting process is a linear, sequential workflow—each step directly impacts the final part quality. Abaixo está um time-axis breakdown do 6 Etapas principais, with key actions and quality checks:
2.1 Etapa 1: Preparação de matéria -prima & Fusão
- Seleção de material: Choose die-casting-specific alloys (Por exemplo, aluminum alloy ADC12 for high fluidity, 6061 for high strength) that meet part performance needs.
- Fusão: Heat the alloy in a crucible furnace to 660~720°C. Use a temperature sensor to monitor in real time—avoid overheating.
- Desgaseificação & Refino: Add scouring agents (Por exemplo, hexachloroethane) para remover o hidrogênio (a major cause of porosity) e impurezas (Por exemplo, slag). Para peças de alta precisão, usar vacuum degassing—reducing hydrogen content by 80%.
Verificação de qualidade: Use a metal sample analyzer to verify alloy composition (ensure no excess impurities like lead or cadmium).
2.2 Etapa 2: Preparação de mofo & Pré-tratamento
- Instalação de molde: Fix the pre-machined metal mold (made of H13 hot-work steel for wear resistance) to the die-casting machine’s fixed and moving platens. Align the mold carefully to avoid metal leakage.
- Pré-aquecimento de molde: Heat the mold to 180~250°C using electric heaters or hot oil circulation. Use thermocouples to ensure uniform temperature (±10°C variation is acceptable).
- Pulverização de agente desmoldante: Spray a water-based or oil-based release agent on the mold cavity surface. Esse: 1) Prevents metal from sticking to the mold; 2) Extends mold life (by reducing thermal shock); 3) Improves part surface finish.
Verificação de qualidade: Inspect the mold cavity for scratches or residue—repair scratches >0.1mm deep to avoid part surface defects.
2.3 Etapa 3: Injeção de alta pressão
- Metal Feeding: Pour molten aluminum alloy into the machine’s pressure chamber.
- Injection Execution: The hydraulic system drives the punch to push the metal into the mold cavity at 5~50 m/s. Para peças complexas (Por exemplo, gabinetes eletrônicos), usar two-stage injection: Low speed (5~15 m/s) for the initial filling (reducing turbulence) and high speed (15~50 m/s) for the final filling (ensuring detail replication).
Verificação de qualidade: Monitor injection pressure in real time—abnormal spikes may indicate mold blockages (stop immediately to avoid machine damage).
2.4 Etapa 4: Pressure Holding & Resfriamento
- Pressure Holding: Maintain 20~150 MPa pressure for 1~10 seconds. This compresses the molten metal, eliminating shrinkage holes and improving density.
- Resfriamento: Let the part solidify inside the mold. Cooling time depends on part thickness: 5~15 seconds for thin parts (Por exemplo, 1mm-thick phone casings) and 15~60 seconds for thick parts (Por exemplo, 10mm-thick automotive brackets).
Verificação de qualidade: Use an infrared thermometer to confirm part temperature drops to 300~400°C (liga de alumínio) before mold opening—too high a temperature causes part deformation.
2.5 Etapa 5: Abertura do Molde & Remoção de peça
- Abertura do Molde: The die-casting machine’s hydraulic system pulls the moving platen back, opening the mold.
- Ejeção: An ejection mechanism (pins or plates) pushes the part out of the mold cavity. Para partes frágeis (Por exemplo, thin-walled electronics parts), usar multiple small ejection pins (instead of a single large pin) to avoid part cracking.
- Aparar: Remove excess material (gate, riser, clarão) using a trimming press or CNC router. Para peças de alta precisão, use laser trimming—achieving a cutting accuracy of ±0.05mm.
Verificação de qualidade: Inspect the part for surface defects (Por exemplo, Burrs, arranhões)—burrs >0.03mm must be removed.
2.6 Etapa 6: Pós-tratamento
Post-treatment enhances part performance and aesthetics. Choose processes based on part needs:
Post-Treatment Type | Propósito | Cenários de aplicação |
Tratamento térmico | – Recozimento: Eliminate internal stress (prevents part warping). – Envelhecimento: Improve strength (Por exemplo, 6061 alloy strength increases by 40% after T6 aging). | Parts needing high strength (automotive drive shafts, Componentes aeroespaciais). |
Tratamento de superfície | – Jato de areia: Create a matte finish (hides minor surface defects). – Polimento: Achieve a mirror finish (decorative parts like furniture hardware). – Anodizando: Form a protective alumina film (corrosion resistance for outdoor parts). – Eletroplatação: Add metal layers (chrome for wear resistance, nickel for decoration). | – Jato de areia: Peças industriais (Altas da bomba). – Polimento: Peças decorativas (alças da torneira). – Anodizando: Acessórios ao ar livre (street lamp brackets). – Eletroplatação: Aparelho automotivo (maçanetas da porta). |
Verificação de qualidade: For anodized parts, test corrosion resistance via a salt spray test (must pass 48 hours without rust). |
3. Defeitos Comuns & Solução de problemas: How to Fix Issues
Even with strict process control, defects may occur. Abaixo está um causal chain breakdown de 3 common defects and their solutions:
Common Defect | Causa raiz | Troubleshooting Solution |
Cold Shuts (unfused metal seams on part surface) | 1. Molten metal temperature too low. 2. Mold temperature too low. 3. Filling time too long (metal solidifies mid-flow). | 1. Increase molten metal temperature by 10~20°C. 2. Raise mold temperature by 20~30°C. 3. Shorten filling time by 0.01~0.05 seconds (increase injection speed). |
Porosidade (tiny holes inside the part) | 1. Inadequate degassing (high hydrogen content). 2. Injection speed too fast (turbulence traps air). 3. Holding pressure too low (no pore compression). | 1. Extend degassing time by 2~5 minutes or use vacuum degassing. 2. Reduce injection speed by 5~10 m/s (use two-stage injection). 3. Increase holding pressure by 10~20 MPa. |
Shrinkage Holes (large holes in thick part sections) | 1. Tempo de retenção muito curto (metal shrinks without pressure). 2. Cooling time too short (part not fully solidified). 3. Mold cavity design flawed (thick sections with no risers). | 1. Extend holding time by 1~3 seconds. 2. Increase cooling time by 5~10 seconds. 3. Modify mold design: Add risers (metal reservoirs) to thick sections. |
Yigu Technology’s Perspective on Die Casting Principle and Process
Na tecnologia Yigu, acreditamos “principle mastery + process refinement” is the key to stable die casting quality. Many clients struggle with recurring defects (Por exemplo, porosidade) because they focus only on parameters, not the underlying principle (Por exemplo, how hydrogen causes pores). We advocate a “3-layer approach”: 1) Train teams on die casting principles (Por exemplo, pressure-assisted solidification) to help them understand por que parameters matter; 2) Use intelligent monitoring systems to track real-time parameters (molten metal temperature, injection pressure) and alert for deviations; 3) Para peças personalizadas, optimize mold design (Por exemplo, adding risers to thick sections) based on the filling principle—reducing defect rates by 40% em média. We also prioritize eco-friendly processes (Por exemplo, servo-hydraulic machines, water-based release agents) to meet sustainability goals.
Perguntas frequentes (Perguntas frequentes)
- P: Why is mold preheating necessary? Can I skip it to save time?
UM: No—mold preheating is critical. Moldes frios fazem com que o metal fundido solidifique muito rápido, leading to cold shuts (unfused seams) and poor part strength. Skipping preheating may seem to save 5~10 minutes per mold, but it increases scrap rates by 20~30%—costing more in the long run.
- P: For aluminum alloy die casting, what’s the difference between ADC12 and 6061 ligas? Which should I choose?
UM: ADC12 has high fluidity (ideal para complexos, thin-walled parts like electronics enclosures) but lower strength. 6061 has higher strength and corrosion resistance (suitable for load-bearing parts like automotive brackets) but lower fluidity. Choose ADC12 for complex shapes; escolher 6061 for parts needing strength or outdoor use.
- P: How to confirm if a die-cast part has internal porosity? Can it be fixed after production?
UM: Usar Inspeção de raios X (for critical parts like aerospace components) ou hydrostatic testing (for pressure-containing parts like pump housings) Para detectar porosidade interna. Small pores (≤0.1mm) can be fixed via impregnation (filling pores with resin or wax). Large pores (>0.1milímetros) usually require reworking or scrapping—better to prevent them by optimizing degassing and holding pressure during production.