¿Qué factores determinan las horas de trabajo del mecanizado CNC??

cnc honing

En los talleres de mecanizado CNC, ya sea que produzcan componentes de motores de automóviles o piezas de dispositivos médicos, el horas de trabajo de mecanizado CNC afectan directamente los programas de producción, costos laborales, y tiempos de entrega de pedidos. Esta métrica clave no es aleatoria; Depende de una combinación de diseño de producto., rendimiento del equipo, estrategias de proceso, and operational details. This article breaks down the core influencing factors, step-by-step evaluation methods, typical scenario optimizations, and solutions to common misunderstandings, helping you accurately calculate and efficiently reduce machining hours.

1. What Are the Core Influencing Factors of CNC Machining Working Hours?

CNC machining hours are shaped by four interconnected categories, each with specific sub-factors that can extend or shorten cycle times. Below is a detailed breakdown with quantifiable impacts:

1.1 Product Design Features (Explicar 30-40% of Total Hours)

Design complexity directly increases tool path difficulty and processing steps.

Design FactorImpact on Working HoursEjemplo del mundo realOptimization Tip
Shape ComplexityNon-standard surfaces, thin-walled structures, or deep narrow grooves add 20-50% to hours vs. simple blocksAviation supports with complex ribs need 5-axis linkage machining (8-12 hours/part) VS. 2-3 hours for simple bracketsSimplify non-critical contours; Avoid unnecessary deep grooves (>10x diameter)
Exactitud & Surface RequirementsHigh-precision features (P.EJ., IT6-level holes) require 2-3x more time for semi-finishing + pruebasMirror-polished mold inserts need reduced feed rates (50-100mm/min) VS. 300-500mm/min for Ra 6.3μm surfacesUse multi-step finishing (rough → semi-finish → finish) instead of repeated corrections
Tipo de materialDifficult-to-cut materials slow processing by 30-60% VS. easy-to-cut metalsAcero inoxidable (304) requires 80-120m/min cutting speed vs. 300-500m/min para aleaciones de aluminioChoose carbide tools for steel; Use acero de alta velocidad (HSS) only for low-volume soft metal parts
Feature Quantity & LayoutDense small holes/threads add 15-30% time due to tool changesA 50mm×50mm aluminum plate with 20 M3 threads needs 40+ minutos (VS. 15 minutes for 5 trapos)Group same-diameter features to reduce tool changes; Use multi-spindle heads for hole arrays

1.2 Herramientas & Process Conditions (Explicar 25-35% of Total Hours)

Equipment capabilities and setup efficiency determine how quickly parts can be machined.

Factor de condiciónImpact on Working HoursParámetros claveNota Costo-Beneficio
Rendimiento del equipoLas máquinas de alta rigidez reducen el tiempo de desbaste al 20-30% VS. modelos más antiguosUn nuevo centro de mecanizado vertical (VMC) con husillo de 12.000 rpm acaba un bloque de acero en 4 Horas vs. 6 horas en un VMC de 8.000 rpmActualización de husillos (de 8k a 15k rpm) salvamentos 15-25% en horas parciales de paredes delgadas
Configuración de herramientasLa capacidad insuficiente del almacén de herramientas aumenta 10-20% tiempo de cambio de herramienta manualUn cargador de 24 herramientas maneja una pieza de 5 operaciones en 3 Horas vs. 4 horas con un cargador de 8 herramientas (necesidades 2 cambios manuales)Priorizar herramientas para operaciones de alta frecuencia; Use tool presetters to cut setup time
Clamp SystemQuick-clamp tools reduce downtime by 40-60% VS. manual alignmentA hydraulic vise clamps a part in 2 minutes vs. 10 minutes for manual bolt clampingAdopt zero-point positioning systems for batch production (repeat setup <1 minuto)
Enfriamiento & LubricaciónPoor cooling adds 15-25% time due to sticky chips or tool wearDry cutting aluminum causes 2-3x more tool changes (each taking 5-10 minutos) VS. high-pressure mist coolingUse water-soluble coolants for steel; Air-oil mist for aluminum (reduces chip cleanup)

1.3 Procedures & Operation Strategies (Explicar 20-25% of Total Hours)

La planificación inteligente de procesos elimina pasos redundantes y optimiza las rutas de herramientas.

Factor de estrategiaImpact on Working HoursEjemplo prácticoError común
Planificación de trayectoria de herramientasEl corte de anillos es 20-30% más rápido que el corte en hileras para grandes superficiesUna placa de aluminio de 200 mm × 200 mm requiere 30 minutos con corte de anillo vs. 45 minutos con corte de hilerasEvite el eje Z hacia abajo (causa choque en la herramienta); Utilice espiral hacia abajo para caries profundas.
Asignación de margenMárgenes de desbaste demasiado grandes (P.EJ., >5milímetros) doble tiempo de finalizaciónUna pieza de acero con un margen de desbaste de 3 mm requiere 2 horas para terminar vs. 1 hora con margen de 1,5 mmSigue “áspero 70-80% de material, finish 20-30%” for balance
Exception HandlingUnplanned downtime (P.EJ., rotura de herramientas) can take up 10-15% of total hoursA missed emergency retraction space causes a tool strike, con la atención 2-3 hours of repair timeReserve 5-10mm retraction space; Use collision detection software

2. How to Evaluate CNC Machining Working Hours Step-by-Step?

Accurate hour evaluation requires combining theoretical calculations with practical measurements. Below is a 3-stage method to avoid guesswork:

2.1 Escenario 1: Basic Data Collection (Lays the Foundation)

Gather key information to set calculation parameters.

Data TypeCollection MethodCritical Output
Drawing AnalysisReview tolerance zones, shape/position tolerances, y requisitos de tratamiento térmicoDivide processing into stages (P.EJ., pre-heat treatment roughing → post-heat treatment finishing)
Equipment MatchingSelect machine tools by part size (P.EJ., gantry for >1m parts, VMC for <1m parts)Calculate non-cutting time (P.EJ., gantry machines move at 10m/min vs. 20m/min for small VMCs)
Tool List PreparationList tool type, diámetro (D), and number of teeth; Calculate cutting speed (vc)Use formula: Velocidad del huso (S) = (Vc×1000)/(π×D) (P.EJ., Vc=300m/min for aluminum, D=10mm → S=9549rpm)

2.2 Escenario 2: Segmented Timing & Verification (Validates Theoretical Data)

Test and adjust calculations with real machine runs.

  1. Empty Running Test: Lock the spindle and run the program. Record:
  • Axis movement time (P.EJ., X/Y/Z axis travel time between features);
  • Rapid positioning frequency (each positioning adds 2-5 artículos de segunda clase);
  • Redundant empty strokes (P.EJ., unnecessary tool returns to home).

Resultado: Eliminate 5-10% of non-cutting time by optimizing tool path order.

  1. First Piece Trial Cutting: Run actual machining and log:
  • Start/end time for each process (toscante, semifinisco, refinamiento);
  • Tool change intervals (each manual change takes 3-8 minutos, automatic takes 10-30 artículos de segunda clase);
  • Spindle start/stop delays (agregar 2-3 segundos por ciclo).

Resultado: Adjust theoretical parameters (P.EJ., reduce feed rate if tool vibration occurs).

  1. Abnormal Time Statistics: Track non-value-added time:
  • Tool replacement (5-15 minutes per broken tool);
  • Program debugging (10-20 minutes for complex parts);
  • Measurement waiting (5-10 minutes for CMM checks).

Resultado: These times often account for 10-20% of total hours—plan buffers accordingly.

2.3 Escenario 3: Experience Coefficient Modification (Ensures Practicality)

Adjust theoretical hours to account for real-world variables.

Modification FactorAdjustment RatioRazón
Safety BufferingAgregar 5-15% to theoretical hoursCopes with material hardness fluctuations (P.EJ., ±10% in aluminum alloy hardness) or tool wear
Batch EffectFirst part: +30-50% (includes tool setting/program verification); Subsequent parts: -10-20%The first part of a batch takes 4 Horas vs. 2.5-3 hours for parts 2-100
Environmental CompensationAgregar 5-10% in extreme temperatures (>30°C or <10° C)Shop floor heat causes machine thermal deformation, requiring more in-line measurements

3. How to Optimize Working Hours in Typical CNC Machining Scenarios?

Different part types have unique time-consuming pain points—targeted optimizations deliver quick results. Below are two common scenarios:

3.1 Guión 1: Aluminum Alloy Gearbox Housing

  • Características: Thin-walled cavity (2-3MM GRISIÓN) + 4 mounting surfaces + 12 M8 threaded holes.
  • Key Time-Consuming Points:
  1. Roughing uses a large-diameter face mill (φ50mm) but requires 8-10 passes to remove material;
  2. Finishing needs a long-handled small-diameter tool (φ6mm) to clean cavity roots (slow feed rate: 80-120mm/min);
  3. Threaded holes have aluminum chip clogging, requerido 3-5 blows per hole.
  • Optimization Results:
Optimization MeasureTiempo ahorradoNew Total Hours
Switch to honeycomb lightweight cutterhead (φ63mm)20-25% (reduces passes to 5-6)De 5 horas para 4 horas
Pre-coat tool with anti-stick coating (P.EJ., Tialn)15-20% (speeds root cleaning to 150-200mm/min)De 4 horas para 3.3 horas
Use air blow + succión de vacío durante el enhebrado10-15% (elimina el re-soplado)De 3.3 horas para 2.9 horas

3.2 Guión 2: Stainless Steel Medical Surgical Instrument

  • Características: Tolerancia a nivel de micras (± 0.005 mm) + superficie del espejo (Ra ≤0,2μm) + contornos de curvas complejos.
  • Key Time-Consuming Points:
  1. Grabado de curvas complejas a baja velocidad (50-80mm/min) para evitar rayones en la superficie;
  2. El rectificado manual elimina las marcas de herramientas (acepta 30-45 minutos por parte);
  3. 3D inspección (Cmm) se hace 3 veces por parte (total 20-30 minutos).
  • Optimization Results:
Optimization MeasureTiempo ahorradoNew Total Hours
Introducir el corte asistido por ultrasonido (20-50vibración kHz)30-40% (acelera el grabado a 120-150 mm/min)De 8 horas para 6 horas
Utilice herramientas diamantadas (Ra ≤0,1μm) para acabado de una sola pasada40-50% (elimina el pulido manual)De 6 horas para 4 horas
Combine la medición láser en línea con la verificación final de la CMM50-60% (reduce la inspección a 10-12 minutos)De 4 horas para 3.7 horas

4. What Are Common Misunderstandings About CNC Machining Working Hours?

Misconceptions lead to inaccurate planning and wasted resources. Below are two key myths and their solutions:

MisunderstandingRealityPractical Countermeasure
“Same drawing = same working hours”Equipment generation differences matter: Old CNC systems (≥10 years) process complex G-code 20-30% slower than new systems (≤5 years)Establish an enterprise-level database: Store hours by material, equipment model, y procesar; Update monthly
“Ignore non-cutting time”Non-cutting time (Cambios de herramientas, tool setting, medición) accounts for 25-40% of total hours (no 5-10% as assumed)Use automatic tool changers (ATCs) para >5-Partes de herramientas; Adopt quick-setup fixtures (P.EJ., zero-point systems)

5. Yigu Technology’s Perspective on Working Hours of CNC Machining

En la tecnología yigu, vemos horas de trabajo de mecanizado CNC as a “mirror of process efficiency”—it reflects not just speed, but also the rationality of design, equipo, and operations. Nuestros datos muestran 60% of hour waste comes from “hidden inefficiencies” (P.EJ., poor tool path planning, redundant inspections) rather than equipment speed limits.

We recommend a “digital-driven optimization” approach: For batch parts, we use CAM software to simulate tool paths (corte 10-15% of empty time) and MES systems to track real-time machine data; Para piezas complejas, we apply machine learning to historical data (P.EJ., 10,000+ part records) to auto-recommend optimal parameters (P.EJ., tasa de alimentación, velocidad del huso). By combining standardized processes (for similar parts) and intelligent monitoring, we help clients reduce average working hours by 20-30% manteniendo la calidad.

6. Preguntas frecuentes: Common Questions About Working Hours of CNC Machining

Q1: Can I use the same hour calculation formula for different materials?

No. The core formula (cutting time = material volume / (feed rate × spindle speed × tool efficiency)) must be adjusted for material hardness. Por ejemplo, acero inoxidable (304) necesita un 0.6-0.8 efficiency coefficient vs. 1.0 for aluminum alloy—ignoring this leads to 20-40% underestimation of hours.

Q2: How much time does an automatic tool changer (ATC) save compared to manual tool changes?

An ATC takes 10-30 seconds per tool change vs. 3-8 minutes for manual changes. For a part needing 8 herramientas, esto salva 20-60 minutes per part—critical for batches >50 regiones. Para lotes pequeños (<10 regiones), manual changes may be cheaper (no ATC setup time).

Q3: Why do hours increase for parts with thin walls (<3milímetros) even if they’re simple in shape?

Thin walls require reduced cutting force (para evitar la deformación), lo que significa velocidades de alimentación más lentas (50-70% de estándar) y menor profundidad de corte (0.1-0.3mm frente a. 0.5-1milímetros). Por ejemplo, una pared de aluminio de 2 mm ocupa 40 minutos para terminar vs. 25 minutos para una pared de 5 mm, incluso con la misma área.

Índice
Desplácese hasta arriba